Franklin-Argyle Underground Power Transmission Project
The Franklin-Argyle Underground Power Transmission Project is an urgent project necessary to repair underground power lines and equipment near the intersection of Franklin Ave. and Argyle Ave. in Hollywood.
-
Green Meadows Grid Resiliency Project
Green Meadows Grid Resiliency Project
-
Haskell-Sylmar Transmission Line 2 Project
The Haskell-Sylmar Transmission Line 2 Project will replace the existing 115kV double circuit transmission line with a new 230kV double circuit transmission line.
-
McCullough-Victorville Transmission Lines 1 and 2
McCullough-Victorville (MCC-VIC) Transmission Lines 1 and 2 are two existing 500 kilovolt (kV) electrical power lines supported on approximately 1,740 single-circuit towers, and spanning over 160 miles from McCullough Switching Station in Nevada, through several mountain ranges, into the Mojave Desert and ending at the Victorville Switching Station in California. This will increase LADWP’s share of transmission capacity on West of River (WOR) Path 46.
-
Other Power Projects
Other Power System projects
-
Rinaldi Tarzana Transmission Lines 1 & 2 Upgrade
The Rinaldi-Tarzana Transmission Lines 1 and 2 Upgrade Project is an important part of LADWP’s $4.5 billion Power Infrastructure Plan to accelerate the pace of replacing aging infrastructure.
-
Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project
This project is necessary to maintain grid resiliency and transmission reliability of the City’s electrical power grid during and after the transition to a carbon-free system.
-
Scattergood to West L.A. - Sawtelle Modernization
The Scattergood to West LA – Sawtelle (SWLA) Modernization will replace one underground transmission circuit (cable) that runs through sections of West Los Angeles.